Project name项目名称 | Langqi Minjiang Bridge A1 and A2 contract sections琅岐闽江大桥A1、A2合同段 |
Construction unit建设单位 | China Communications Second Navigation Bureau, China Railway Bridge Bureau中交二航局、中铁大桥局 |
Project description项目描述 | The Langqi Minjiang Bridge is 2675 meters long, the main bridge is 1280 meters long, and the main bridge deck is 28.7 meters wide. Under the bridge, 30,000-ton seagoing ships can be navigable. The main bridge is designed as a twin-tower equal-height cable-stayed bridge with a main span of 680 meters, and the main span length ranks among the top 10 similar bridges in the world. After the Langqi Minjiang Bridge is completed, the central area of Fuzhou Economic and Technological Development Zone can directly enter Langqi through the bridge. With the further improvement of the surrounding road network in the future, the distance from the central city of Fuzhou to Langqi Island will also be shortened to about 23 kilometers. The time can be shortened to about 20 minutes, thus greatly shortening the distance between Langqi and the central urban area of Fuzhou, further highlighting Langqi's location advantage at the mouth of the Minjiang River, and laying a solid foundation for Langqi's great development, great development and great leap. The construction units are China Communications Second Navigation Bureau and China Railway Bridge Bureau.琅岐闽江大桥长2675米,主桥长1280米,主桥桥面宽28.7米,按双向4车道加紧急停车带设计,预留双向6车道。桥下可通航3万吨级海轮。主桥设计为主跨680米长的双塔等高斜拉桥,主跨长度居世界同类桥梁前10名。琅岐闽江大桥建成后,从福州经济技术开发区中心区可直接通过该桥进入琅岐,随着今后周边路网的进一步完善,福州中心城区至琅岐岛的距离也将缩短到23公里左右,行车时间可缩短至20分钟左右,从而大大拉近琅岐与福州中心城区的距离,进一步凸显琅岐在闽江口的区位优势,为琅岐大开发、大发展、大跨越奠定坚实基础。施工单位为中交二航局、中铁大桥局。 |
Supply product供应产品 | Squeezing agent,grouting material压浆剂、灌浆料 |